GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAILWAY BOARD
No. 2007/Elect (TRS)/225/7 New Delhi, Dated: 26.04.2023
General Managers,
All Indian Railways (incl. KRCL)
Sub: Duty Hours of Running Staff
Ref :(i) This office letter of
even dated 24.04.2023
(ii) Railway Board’s letter
no. E(LL)/2016/HPC/1 dt. 28.11.2016
Zonal Railways were sensitized on the issue of running staff being worked for more than the stipulated duty hours vide letter under ref.(i). Some Zonal Railways have sought clarification on the stipulation of the duty hours.
In order to clarify, instructions contained in Board’s letter 28.11.2016 are reiterated as under: :
(i) Total duty at a stretch (from ‘sign on’ to ‘sign off’) for the Running Staff should not exceed 11 hours.
(ii) Running duty at a stretch should not ordinarily exceed 9 hours. Such duty may extend further provided the railway administration gives at least 2 hours’ notice before the expiry of 9 hours to the crew that they would be required to perform running duty beyond 9 hours, with the stipulation that the total duty from 'sign on' to ‘sign off’ shall not exceed 11 hours.
(iii) In case train does not reach its destination, normal crew changing point or the point where the reliver has been arranged, within overall limit of 11 hours, and such a point is approximately one-hour journey away, the Running Staff shall be required to work to-that point provided the maximum hours in that trip does not exceed 12 hours.
(iv) For loco pilots of all Mail/Express trains, the running duty (for the purpose of preparation of links only) should not exceed 8 hours. However, P&C time shall not be included within 8 hours.
(v) The above provision for running duty hours and total duty hours shall be applicable to all Running Staff including Loco Pilots (Mail/Express), Loco Pilots (Passenger), Loco Pilots (Freight), Motormen and Guards except wherever stated otherwise.
(vi) Subject to exigencies of service, Headquarter rest of all Running Staff will be 16 hours irrespective of the duration of their incoming trip. Further, in exigencies of service, the existing provision will continue to be the minimum condition.
It is again advised to ensure
compliance.
कार्यकारी निदेशक विद्युत चल स्टाक
फ्लोर सं : 4, कमरा सं. : 113, रेलवे बोर्ड
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.